Yes I know it's been going for ever but getting closer to finishing my project. Just to update the latest:
- Precision 6265 Turbo
- New Supertech valve train, Wiseco Pistons (tolerance 600-700bhp) and eagle Rods (tolerance 600-700bhp)
- Custom Full 3" exhaust system
- Side winder turbo manifold and waste gate dump tube have been made.
- Engine/gearbox removed.
- MeisterR coil overs have been fitted. (final height adjustment will be done when full engine/turbo setup has been fitted)
- Original engine stripped down, measured and checked. Replacement Engine block sent off for machine work, ie Boreing, honing, refacing and hot tank.
- Head has been diss assembled, cleaned ready for valve train to be installed.
- Crank has been micro polished, measured for bearings and ready for re-fitment.
Going to see the car on Tuesday 30th April as hopefully engine will be back. More updates to follow soon.