I had my last 2 cars delivered within 2 weeks of being built in Germany, so Honda should be able to do better than that.
This has me wondering now, how long does a build actually take? If the car was to be built in December aswell how long before if gets a chassis number? If I can get some ammo to fire at the dealer when I call them that'd be helpful, as if it's supposedly built but no chassis number I'd wonder if their fibbing and fobbing